1 instrumentation and industrial automation systems, gas turbine overhaul collaboration in Tabriz Petrochemical 27 MW power plant in 1381.
2 collaborate on projects and power plant instrumentation Tabriz Sahand Cup 1384.
3 Repair and maintenance of electrical equipment, automation, instrumentation, calibration, factory Tabriz Sahand Cup dated from 1385 to 1392.
4 of 6 AT cooperation in optimizing CNC Machine Sazi Tabriz, instead of replacing computer devices to send and receive data relevant Nvarkhvan 1385.
5 Installation of equipment for cement factory fuel system Zanjan, implementation and automation of fuel based on PLC, HMI and controller of Siemens and the problem of control valves for the shortcomings of the positioner and 1386.
6 Installation of equipment and control boards Fkv casting plant in the town of foreign investment in 1388.
 
7. tray intake cabling, installation of instrumentation equipment for automation and batch plant, casting plant Sahand igneous 1388.
8. tray intake cabling and installation and commissioning of automation equipment and instrumentation silica Tabriz Sahand 1389.
9-line weighing system design and implementation silica material on the conveyor belt using silicon modules SENECA Tabriz Sahand in 1389.
Overhaul of instrumentation and industrial automation systems 10 partnership in steam turbine
 
6 MW of the company in 1390 Semnan sodium carbonate.
11 Performing backup and computer related DCS systems (water, power, fuel) of sodium carbonate in 1390 Semnan.
12 Setup and Repair screw Kmprvssvr Dalgakiran Turkey 1393.
13 installation and repair Air-Gonka Turkey 1393.
14 Sarbandi cabling installation and instrumentation, DCS and calibration of weighing systems Batch Plant Tabriz Sahand flute in 1392.
15 Sarbandi cabling installation and instrumentation, PLC, nitrogen and hydrogen analyzer unit Tabriz Sahand flute 1393.
16 cable, Sarband, and installation of instrumentation and DCS of the furnace, tin bath and flute Tabriz Sahand Lhr 1393.
17 cooperation in the design, procurement, construction and commissioning of the unit H2 N2 Mixing Plant Tabriz Sahand flute 1393.
18 Installation 4 1.5 MW diesel generators brands MTU control system Wodward Tabriz Sahand Cup 1393.
19 Installation, cabling and transformers up to 20KV. 2000 1600 1250 KVA. S·hd flute Tabriz 1393
20 Installation and set up the feeder HV 1250 and 4000 amp amp amp LV2000 Tabriz Sahand flute 1393